[vc_row css_animation=”none” inner_container=”true” bg_image=”288″][vc_column css_animation=”fadeIn” width=”1/3″][/vc_column][vc_column width=”1/3″][/vc_column][vc_column css_animation=”fadeIn” width=”1/3″][/vc_column][/vc_row][vc_row inner_container=”true”][vc_column fade=”true” fade_animation=”in-from-left” fade_animation_offset=”450px” width=”1/1″]
INDUSTRIAL QUALITY SOLUTIONS
INSPECTION SERVICES
Automotive  components  manufacturers
Types
  • visual check
  • touch check
  • caliber-gauge inspection
  • measure tool inspection
Locations
  • Incoming material inspection
  • On the line inspection
  • Within the line inspection
  • End of the line inspection
  • Statistical process control
[/vc_column][/vc_row][vc_row inner_container=”true” bg_image=”288″][vc_column width=”1/3″][/vc_column][vc_column width=”1/3″][/vc_column][vc_column width=”1/3″][/vc_column][/vc_row][vc_row inner_container=”true” no_margin=”true”][vc_column fade=”true” fade_animation=”in-from-left” fade_animation_offset=”450px” width=”1/1″]

We provide expert quality support to manufacturers and distributors operating mainly at automotive or electronic industry, so that they can meet the continously increasing requirements of their customers quickly. Diversity of supplier chain demands fast reaction and complex services. Whether it is inspection, sorting, containment, rework, Goodstone is ready to serve its customers quickly. All our quality check is ruled by approved Working instructions, and precisely trained to our staff. Our inspectors are provided with all the necessary measuring equipments to perform their jobs properly.

Goodstone provides Proactive and Reactive Containment in both Advanced Quality Planning (APQP) and current production.  1. As part of the Proactive Containment, Goodstone will offer an Early Production Containment with a minimum timeframe of 30 regular production days. The Pre-Launch Control Plan strategies are utilized for all early production containment program requirements (i.e. pilots, PPAP builds, etc.) and continue for the duration specified by the procuring location, the benefit being of avoiding the costly Reactive Containment.

[/vc_column][/vc_row][vc_row inner_container=”true” bg_image=”288″][vc_column width=”1/3″][/vc_column][vc_column width=”1/3″][/vc_column][vc_column width=”1/3″][/vc_column][/vc_row][vc_row inner_container=”true” no_margin=”true”][vc_column fade=”true” fade_animation=”in-from-left” fade_animation_offset=”450px” width=”1/1″]

REACTIVE CONTAINMENT This will be issued as a result of a complaint communicated by us (e.g. Problem Solver, phone call, fax, etc) to the supplier. The immediate containment sections, of the problem report, documents the necessary activities to immediately prevent future nonconforming product from reaching us or our customers. The supplier provides an initial response consisting of specified information, at a minimum within one (1) business day of receiving the problem report.

[/vc_column][/vc_row][vc_row inner_container=”true” no_margin=”true”][vc_column width=”1/1″]

REWORK

Containment of non-conforming parts, possibly rework with own tools.
Special tools, advanced measuring equipments (Optical measure profile projector)


[/vc_column][/vc_row][vc_row inner_container=”true” no_margin=”true” bg_image=”380″][vc_column fade=”true” fade_animation=”in-from-left” fade_animation_offset=”450px” width=”1/2″]

Engineering activity

  • Immediate contact with suppliers, informing on quality failures
  • Constant connection with quality, logistics, production department
  • Preparing Daily Reports on the executed works (time, manpower, number of inspected parts)
  • Preparing and training of Work Instructions


Development

  • Improving quality system, consultancy
  • On-site trainings
  • Supplier quality development
[/vc_column][vc_column width=”1/6″]
[/vc_column][vc_column fade=”true” fade_animation=”in-from-right” fade_animation_offset=”450px” width=”1/6″]

Types

  • Sorting
  • Containment
  • Rework
  • Quality firewalls
[/vc_column][vc_column fade=”true” fade_animation=”in-from-right” fade_animation_offset=”450px” width=”1/6″]

In practice

  • Cutting
  • Grinding
  • Polishing
  • Hammering
  • Cleaning
[/vc_column][/vc_row]